New pools

New pools, designed with the house

Contemporary, Mediterranean and infinity pools for villas and private homes on the Costa Blanca — considered with the architecture, the garden and the way you live outside.

Rectangular contemporary pool beside a modern white villa with olive trees

A new pool is one of the few additions that changes both how a house looks and how it is lived in. The best ones feel inevitable — as if the house had always been designed around them.

We start with the brief: where the pool sits, how it meets the terrace, what it should feel like at noon in August and at dusk in October. Then we design it, prepare the budget and build it — coordinating excavation, structure, installations, finishes and the terrace through to the day you swim.

Types

Kinds of pool

Detail of clear water meeting a honed limestone pool edge

Materials

Finishes, coping and the colour of water

The interior finish determines the colour of the water and much of the character of the pool. Glass mosaic (gresite), porcelain, natural stone, micro-cement and reinforced membranes each behave differently under strong sun and hard water.

Sand and pale-grey finishes give the soft, luminous water typical of Mediterranean villas; darker finishes read as reflective and architectural. Coping — travertine, limestone, porcelain — should be non-slip, cool underfoot and continuous with the terrace.

Read: choosing the right pool finish

Design

What to consider from the start

Integration

Position relative to the house, sun path, wind, privacy and the view. Levels and lines that continue the architecture.

Size & depth

Swimming, relaxing, children, entertaining. Shallow ledges and wide steps are often used more than depth.

Lighting

Underwater LED, terrace and garden lighting planned together so the pool reads well at night.

Heating

A heat pump and a cover can extend the season from summer to most of the year. Heating options.

Automation

Filtration, temperature, water quality and lighting controlled and monitored remotely — useful when you are away.

Terrace & exterior

Paving, shade, showers, outdoor kitchen and planting. Outdoor living.

Budget

What determines the budget

Every project is quoted individually after a site visit. These are the factors that move a budget most.

  • Size and depth

    Water volume, surface area and the amount of excavation and structure.

  • Terrain and access

    Rock, slopes, retaining walls and how machinery reaches the plot.

  • Structure

    Gunite or poured concrete, overflow or infinity edges, elevated sections.

  • Finishes

    Mosaic, porcelain, natural stone or micro-cement; coping and steps.

  • Equipment

    Filtration, saltwater, heating, covers, lighting and automation.

  • Surroundings

    Terrace area and materials, shade, landscaping and irrigation.

  • Design & licences

    Architect or technical project where required, and municipal licence fees.

For indicative ranges, read How much does it cost to build a swimming pool in Spain? Figures are indicative only; a real figure comes from our site visit and detailed budget.

Turnkey

From design to handover

You explain what you want. We manage everything else, as one project.

Questions

How long does it take to build a pool on the Costa Blanca?

Construction itself often takes two to four months for a villa pool, but licences, design and scheduling can add several months. Starting in autumn or winter is usually wise if you want to swim in summer.

Do I need a licence?

New pools generally require a municipal licence. Requirements vary between towns and plots; we confirm what applies to yours and coordinate the application.

Who manages the works?

We do. Solmarea coordinates and supervises every trade involved — excavation, structure, installations, finishes and terrace — and keeps you informed until handover.

Can the pool be heated?

Yes. An inverter heat pump combined with a cover is the most common way to extend the season on the Costa Blanca.

Planning a new pool or a renovation?

Tell us what you have in mind and we take care of the rest. It takes about three minutes.

Request a project study